| OWNERSHIP |
Vision Equities, LLC |
 |
|
|
| YEAR BUILT |
2010 (LEED Certified Silver Core and Shell) |
|
|
| RENTABLE SQUARE FEET |
66,003 RSF |
|
| CROSS STREET |
Intersection I-80 and I-280 at Cherry Hill Road and Route 46 |
|
| FLOOR SIZES |
1st: 31,917 (1st floor); 34,086 (2nd floor) |
|
| WINDOWS |
Solar control, clear exterior anodized aluminum frame system with 1" double-glazed insulated tinted glass Continuous window band, height: 7'-9' |
|
| ELEVATORS |
One (1) Schindler Haughton elevator: 2,500 pound capacity |
|
| PARKING |
Ratio: 4/1,000 sq ft. |
|
| LOADING |
Covered tailgate loading, with two (2) bays, at rear side of building, interior staging area. |
|
| ROOF |
EPDM membrane on insulation board |
|
| SAFETY SYSTEM |
Building is fully protected by new wet sprinkler system. Building core has two (2) fire-rated stairwells on each side of the elevator bank. All-new fire alarm system includes horns, strobes, smoke detectors, manual pull stations, flow switches, and tamper switches |
|
| SLAB TO SLAB HEIGHT |
Floor to floor ht. 12'-6" |
|
| CEILING HEIGHT |
9'0" Finished |
|
| FLOOR LOAD CAPACITY |
100 pounds per square foot |
|
| TRANSPORTATION |
Major highways- Route 80, Route 287, Route 46 (within 1/4 mile), Route 10 |
|
| BUILDING HOURS |
Monday to Friday 8 a.m. to 6 p.m., Saturday 8 a.m. to 1 p.m. |
|
| SECURITY |
After hours card access |
|
| INTERNET ACCESS |
Fiber Optic |
|
| TV ACCESS |
Satellite (cable available) |
|
| ELECTRICAL SERVICE |
1,200 amp service, 277/480 volt, 3 phase 4 wire |
|
| HVAC SYSTEM |
(2) 80 ton air cooled Carrier rooftop units serving Trane chilled water fan coil units with fresh air intake. (4) Trane rooftop annex energy recovery ventilators (heating and cooling). Building energy management systems. |
|
| AMENITIES |
- Bucolic campus setting with pond, stream, and park bench seating areas
- Attractive expanded window line throughout building
- Card access security
- Upgraded vending/news area
- Mountain Lakes community restaurants and shops |